Worldwide support & sales network
+65 80228107
bg image //a.storyblok.com/f/127106/1920x800/03e661e04d/rb-project-bangkok.jpg

Bentonite-based drilling fluid system for RB Bore pile project in Bangkok

Bore pile in Thailand

Bentonite Slurry System for RB Bore Pile Project in Bangkok

The RB project is a modern building complex of 26 floors, which will serve as housing, hotel, mall, restaurants, office and retail space in Bangkok. Our contribution involved providing drilling fluids for the construction of 682 bore piles as part of the RB Project, destined to house diverse complexes. Our drilling fluid design incorporated a system with remarkably low solids content. By integrating our high-performance bentonite TIXOBENT M2 and the clay inhibitor BMS 1000, we successfully enhanced solids control, optimized material usage, and streamlined sludge disposal. This achievement holds particular significance for drilling projects located in densely urbanized areas like Bangkok, where efficiency and environmental considerations are paramount.

Project Responsibilities

1.20*70M 45 piles

1.50*70M 637 piles

Project Challenges

Bangkok soil conditions (Clay and Soil)

Delivered Drilling Fluid Products

card image

TIXOBENT MT

A high-yield bentonite with optimized rheology, specifically developed for deep foundations works under different soil and water conditions.

All drilling fluid products